The “Tunnel Highway” Construction on the new Turnpike, funded by bond issues as well as a large grant from the Works Projects Administration, began in 1937. The highway officially opened on October 1, 1940, although anyone who has traveled from Mount Hope to the Pittsburgh Renaissance Festival near New Stanton knows, it is still very much under construction. Abandoned Turnpike There is a 13-mile stretch of the Turnpike, east of the Breezewood exit, that was bypassed in 1968, and is still there, closed to traffic and abandoned. This includes three tunnels and a travel plaza, now accessible only to bikers, hikers and other outdoor adventures, with an 8.5 mile stretch owned by the Southern Alleghenies Conservancy. Tim Dooley is the host of Vagabond Voice News, Mon-Fri at 6AM, 10AM, 1PM, 4PM, 7PM & 10PM Eastern at vagabondvoice.net