TUBE NEWS TN April 2018 | Page 36

MTI Mischtechnik at NPE 2018 Biggest-ever MTI mixer supplied to the U.S. is exhibited at trade fair booth At the NPE 2018 trade show staged in Orlando, Florida from May 7 -11, 2018, MTI Mischtechnik, a technology and quality leader in the manufacture of mixing and processing machines, will present its current portfolio of container-type, vertical, horizontal, cooling, and heating/cooling mixers for the plastics industry. One highlight at the company’s booth – #W4545 in the West Hall, Level 2 – is a Heating/Cooling Mixer Combination MTI Flex®-line type M 2000 / K 8000 that impresses with its outstanding dimensions, providing 8,000 liters of cooling vessel capacity while measuring over 7 m (23 ft) in length and close to 5 m (16.5 ft) in height. Directly after the show, the machine is to be shipped to Northern Pipe Products Inc., a major manufacturer of PVC pipe serving the Midwestern USA and Canada. With the installation of this system – the largest heating/cooling mixer combination MTI has ever supplied to the USA – mixing capacity will almost double at this customer’s site. Burkhard Wulf, Area Sales Manager at MTI, comments: „We have been witnessing a trend towards ever-increasing production volumes in the U.S. market for quite some time. With this Flex®- line M 2000 / K 8000 for Northern Pipe Products we address the associated demand; needless to say, the same holds true for our Flex®-line M 2500 / K 8000 model which provides the ultimate in mixer capacity. These systems can deliver the specified mixtures in appropriate quantities without compromising on mixing quality or high-precision recipe compliance. We are looking forward to delivering this large-size machine to Northern Pipe soon – a company which, like our own, has been a hallmark of precision, accuracy and high-grade products for decades.“ „In our production we have  relied on an MTI heating/ cooling mixer combination with 1,500 liters of heating mixer and 4,250 liters of cooling mixer capacity for almost 30 years now”, explains Derek Hanson, Vice President of Engineering at Northern Pipe. “In 2014, acting in close cooperation with MTI, we replaced the original cooler with a revised model of the same type. Unfortunately, it was not possible to install a larger system at the time as we had utilized the available floor space optimally already. The entire machine has been performing with high reliability since its installation, and when we needed spare parts they were promptly made available to us, along with the associated customer service. Still, the day came where this system’s output could no longer keep up with our demand. Once we resolved to install a significantly larger unit, it was only logical that we should go back to MTI for its implementation. Together, we managed a solution despite all 36 TUBE NEWS EVENTS April 2018