A Look Ahead Here is a quick glimpse into projects in the works across the building study, referendum planning, public involvement country. Watch for more on them in our blog (AyresAssociates. meetings, architectural and interior design, structural, civil com/blog/) and in future TRENDS issues. engineering, and survey services. Referendum planning leads to school’s new addition, renovation Development rises above the ashes After more than a year of referendum planning, the Gresham School District in Wisconsin has a new addition and renovation under way. Ayres assisted with the referendum and is now providing design services for the 20,300-square-foot addition and 5,500-square-foot renovation to the school, which serves elementary, middle- and high-school students. The $8 million upgrade will include a new and renovated school wing for the middle and high school students, as well as a new common cafeteria and kitchen that will serve all grades. Careful planning and design was required to keep the building operational The Windsor Mill development in Windsor, Colorado, has proven throughout the school year while allowing a phased transition it’s a survivor not just once, or twice, but now three times. When and demolition of the original 1935 school building that is used a 2008 tornado touched down in the heart of the northern for much of the middle and high school curriculum. A secured Colorado community, the 14,400-square-foot Windsor Mill & entrance was also included in the design. Elevator Co. building was heavily damaged while it was amid a redevelopment effort (a fire first burned the building in the late 1800s). In 2016, Fort-Collins, Colorado-based developer Blue Ocean Enterprises stepped in to restore the historic building. Just as the restoration was nearly complete, disaster struck again when an arsonist burned the building nearly to the ground in 2017. Instead of giving up, Blue Ocean and the Windsor Downtown Develop Authority (DDA) rolled up their sleeves and retooled the project, which had now transformed from a redevelopment project to mostly a new construction effort. It has recently Bidding plans for the project were completed in less than 10 opened with two tenants: Cacciatore Windsor at Heller’s Kitchen weeks to accommodate the school’s schedule and to begin and the Windsor Mill Tavern. Plans for a brewpub at the location construction by the start of summer in 2019. The final phase are also under way. An old silo from the property was relocated will start in the summer of 2020, with completion of the whole to behind the mill to be used as a stage and event space. project planned for the end of 2020. Ayres provided an existing Although the redevelopment can no longer be considered 28 | TRENDS Ingenuity, Integrity, and Intelligence.