Trends Fall 2014 | Page 9

utilities, widening sidewalks, and putting in a multi-use path on one side of the road. Besides new sidewalks, the roundabout design included pedestrian crosswalks with rectangular rapid-flash beacons with an audio tone for the visually impaired. Ayres Associates teamed with Ourston Roundabout Engineering (now GHD) on the roundabout design. Since the roundabout has opened, Mason said the severity of crashes has dramatically decreased. Happier travels Once construction was under way, a full-page advertisement was placed in the newspaper to show how the roundabout would function while providing rules on how to drive through it. Then when the intersection was ready to fully open, the City held a series of educational sessions for the public. As part of these sessions, presenters encouraged residents to guide replica cars and trucks on a tabletop printout of the roundabout to explain how traffic flows. “We were overwhelmed with the number of people who turned out for those sessions,” Mason said. And these days, thanks to the roundabout and other corridor improvements, Cheyenne residents are enjoying their drive with much less frustration. Travel time through the roundabout is much less now compared with going through two traffic lights no matter which direction motorists were driving. “For the most part, the reaction has been positive,” Dana said. “People are getting more used to (the roundabout) and more comfortable. We’ve had a lot of comments about how pleased people are with how well traffic is moving.” Fast Fact According to the website RoundaboutsUSA, the number of roundabouts in the United States as of December 2013 was about 3,700. Cheyenne Mayor Rick Kaysen said he has been getting positive comments from residents about the roundabout and other corridor improvements. “It was a major change for the community, but after construction was done, I was getting comments like ‘This thing is working wonderfully,’ and ‘Why didn’t we do this sooner?’ ” Kaysen said. “The acceptance is there.” http://www.roundaboutsusa.com/history.html. Taking it to completion Construction of the roundabout and corridor improvements began in spring 2013, and the two-lane roundabout was opened to the public in December 2013. All pavement markings, pedestrian improvements, landscaping, and other finishing features were completed by June 2014. The total construction cost for the corridor and roundabout was about $9 million, funded by a mixture of federal and local funds. Mason credited the collaboration among the MPO, the City, Ayres Associates, and Ourston for the project’s success. “Working with the Ayres team was great. They did a super job with the planning process and dealing with the public,” he said. “We had high regards for the abilities of both Ayres and Ourston. I knew we were in good hands.” The project included rehabilitating and reconstructing about 1.25 miles of East Pershing Boulevard west of and leading up to the roundabout intersection, installing new TRENDS │9