TPDES Stormwater Annual Report FY2022 TPDES Stormwater Annual Report FY2022 | Page 12

I .
Structural Controls
The Stormwater Maintenance Crew maintains the stormwater conveyance infrastructure , i . e ., the stormwater conveyance infrastructure that is within the city ’ s rights-of-way including , major bridges , culverts , inlets , and barrow ditches . The crew performs inspections to identify maintenance and repair needs . The crew accomplished the following during the reporting period :
Activity
Sum of Labor
Hours
Debris Hauled
( in cubic yards )
Backfill
12.25
0
Bridge Deficiency Repair
108.15
6.5
Clean ( Vac Truck Pipe Cleanings )
206.25
32
Clean Concrete Channel
1664.75
1843.55
Clean Culvert / Bridge
1774.25
2269
Clean Earthen Channel
534.75
1053
Clean Flume
586.5
224.25
Clean Inlet
482.32
188.4
Clean / Grade Bar Ditch
237
62
Control Vegetation
450.5
168.5
Dirt & Mud Removal
72.5
56.6
Field Inspection ( No Condition )
542.63
11
Field Verification
85
0
Fill Void
398
0
Graffiti Clean Up
102.14
0
Hydro Excavation
63.5
18
Illegal Dumping Response
54.75
102
Inlet Decal Install
52.6
0
Inlet Inspection
1071.22
0
Inspect ( Pipe Inspections All )
1034.15
0
Inspect Channel / Flume
605.25
0
Lid Replacement
15.25
0.1
Locate Line
10.5
0
On-Call
40.25
40.5
Remove Debris or Obstacle
436.75
334.5
Remove Tree Limbs
1073.75
1109.75
Repair Drainage Pipe
130.25
0
Repair Drainage Structure
1312.75
110.75
Request Line Locate
3
0
Saw Cutting
143.5
5
Special Events
10.5
0.5
Special Projects
128.5
14
Storm Inspection
301.1
5.25
Trim Trees / Brush
0.75
0
Grand Total
13745.31
7655.15
11