TPDES Stormwater Annual Report FY2021 TPDES Stormwater Annual Report FY2021 | Page 60

SUMMARY OF INDUSTRIAL AND CONSTRUCTION INSPECTIONS
During the reporting period , approximately 250 construction sites were active ( in progress ) during the reporting period including 115 new construction sites . These sites are regularly inspected by the City ’ s Environmental Specialists . Construction inspections occurring during FY21 reporting period total 2,231 .
City of Arlington records indicate that there are 97 facilities that carry MSGP coverage : 47 facilities hold a Notice of Intent ( NOI ) and 50 facilities carry a No Exposure Certification ( NEC ). Due to COVID-19 , inspections were limited for much of FY2021 . There were 54 facility inspections completed for industrial stormwater discharges during the reporting period ; 31 NOI inspections , 23 NEC inspections , and 1 Follow-Up NOI Inspections . There were a total of 54 industrial pretreatment inspections and 0 surveys ( commercial backflow prevention and wastewater treatment inspections ) conducted by City of Arlington Water Resource Services during the reporting period .
79