Kee Branch Trib 1 ( Green Oaks to Oak Springs ) Erosion – Reach based streambank stabilization to reduce erosion and restore aquatic habitat as part of the Erosion Pilot Program . Kee Branch Trib 4 ( Deaver Park to Andalusia Trail ) Erosion , Phase 2 – Reach based streambank stabilization to reduce erosion and restore aquatic habitat as part of the Erosion Pilot Program . This project is being completed in phases . Phase 1 included improvements from Deaver Park to Bradley Lane . Phase 2 includes the stream segment from Bradley Lane to Andalusia Trail . Matthews Court Drainage Improvements , Phase 3 – Drainage improvements to alleviate residential flooding . This project is being constructed in phases . The third phase included drainage system improvements from Fielder Road to Matthews Court . VC ( A ) -1: Ridgewood Terrace to Sylvan Drainage and Erosion Project – Drainage improvement project to address flooding and erosion between the Ridgewood Terrace neighborhood and Sylvan Drive along Stream VC ( A ) -1.
The following watershed studies were underway during this reporting period :
�
�
�
Rush Creek Watershed – This study is substantially complete . The mapping modifications are currently under FEMA review . Trinity River Tributaries and Lower Village Creek Watershed Studies – Three consultants are under contract for individual creek segments . Two of three Watershed Studies have been accepted by FEMA . The LOMRs have been issued and residents have been notified . The last Watershed Study is currently under review by FEMA . Lynn / Bowman , Upper Village , Trinity Tribs Watershed Studies – The Upper Village / Trinity Tribs Watershed Study is completed and has been accepted by FEMA . Effective dates have been issued . The Lynn / Bowman Watershed Studies are under review by City .
20