The following table presents the efforts expended during reporting period for maintenance and repairs to prevent sanitary sewer overflows :
Activity |
# of Work Orders |
Linear Footage |
Clean – Manhole / Cleanout |
16 |
N / A |
Repair – Sewer Line |
49 |
N / A |
Repair – Manhole / Cleanout 103 N / A Basin Clean – Sewer Line 2 707
Grease Remediation – Sewer Line 293 84,863 Clean for TV – Sewer Line 394 110,349
Monthly Clean – Sewer Line 0 0 PM Clean – Sewer Line 3,289 1,005,602
Root Remediation – Sewer Line 24 8,898 Root Saw – Sewer Line 0 0 Stop Call – Sewer Line 1,746 649,808
TV Sewer Line 2,063 666,101 SL-RAT Sewer Line 0 0
Grand Total 7,979 2,526,328
A total of 78 was reported Sanitary Sewer Overflows in FY20 . All reported SSO ’ s included incidences of wastewater entering a storm drain or watercourse , for a total of 78 occurrences .
IV .
Household Hazardous Waste ( HHW ) and Used Motor Vehicle Fluids
The City of Arlington continued its participation with the Environmental Collection Center ( ECC ) operated by the City of Fort Worth , Texas . Under an annual contract , Arlington citizens may take their HHW to the ECC free of charge . A Mobile Collection Unit ( MCU ) is scheduled once per month ( except December ) in various areas of the city for satellite collection of HHW , however due to COVID-19 many of these events were canceled . Additionally , some of the material collected at the ECC and mobile collection events is recycled .
Amount of material collected ( in pounds ) and accounting of recycled material by month is outlined below ( in pounds ). A total of 682,598 pounds of HHW materials was received by the ECC in FY20 , of which 73,232 pounds was recycled .
24