North Fork Cottonwood Creek Channel Repair ( South of Park Row ) Phase 2 – channel improvements to repair erosion and undermining within an existing concrete channel . Phase 1 of this project from the channel outfall to Carter Drive was previously constructions . Phase 2 from Carter Drive to Sherry Street is on hold indefinitely due to easement acquisition . VC ( A ) -1: Ridgewood Terrace to Sylvan Drainage and Erosion Project – Drainage improvement project to address flooding and erosion between the Ridgewood Terrace neighborhood and Sylvan Drive along Stream VC ( A ) -1.
The following watershed studies were underway during this reporting period : � �
Rush Creek Watershed – This study is substantially complete . The mapping modifications are currently under FEMA review . Trinity River Tributaries and Lower Village Creek Watershed Studies – Three consultants are under contract for individual creek segments . Two of three Watershed Studies have been accepted by FEMA . The LOMRs have been issued and residents have been notified . The last Watershed Study is currently under review by FEMA . Lynn / Bowman , Upper Village , Trinity Tribs Watershed Studies – The Upper Village / Trinity Tribs Watershed Study is completed and has been accepted by FEMA . Effective dates have been issued . The Lynn / Bowman Watershed Studies are under review by City . Fish and Cottonwood Creeks Geomorphological Assessment – This assessment is complete and has been accepted by the City . is also included in this project .
20