TPDES Stormwater Annual Report FY2020 TPDES Stormwater Annual Report FY2020 | Page 17

02 . Post Construction Stormwater Control Measures

100 %

Flood projects tracked ( progress , scope , and bene�ts )

100 %

of 1 acre + projects evaluated for post construction BMP opportunities

1

Post-construction BMP inspection position approved

6 Flood control projects completed