TPDES Stormwater Annual Report FY2019 | Página 61

SUMMARY OF INDUSTRIAL AND CONSTRUCTION INSPECTIONS

SUMMARY OF INDUSTRIAL AND CONSTRUCTION INSPECTIONS

During the reporting period , approximately 176 construction sites were active ( in progress ) during the reporting period including 125 new construction sites . These sites are regularly inspected by the city ’ s Environmental Specialists . Construction inspections occurring during the 3-IRP total 2484
City of Arlington records indicate that there are 89 facilities that carry MSGP coverage : 40 facilities hold a Notice of Intent ( NOI ) and 49 facilities carry a No Exposure Certification ( NEC ). There were 68 facility inspections completed for industrial stormwater discharges during the reporting period ; 39 NOI inspections , 29 NEC inspections , and 2 Follow-Up NOI Inspections . There were a total of 73 industrial pretreatment inspections and 307 surveys ( commercial backflow prevention and wastewater treatment inspections ) conducted by City of Arlington Water Resource Services during the reporting period .
63 | Page