I . |
Structural Controls |
|||
The Stormwater Maintenance Crew maintains the stormwater conveyance infrastructure , i . e . the | ||||
stormwater conveyance infrastructure that is within the city ’ s rights-of-way including , major bridges , | ||||
culverts , inlets and barrow ditches . |
The crew performs inspections to identify maintenance and repair |
|||
needs . The crew accomplished the following during the reporting period : | ||||
Activity |
Labor Hours |
Debris Hauled / Removed ( yd 3 ) |
||
Bridge Deficiency Repair |
334.75 |
42 |
||
Channel / Flume Inspections |
629.47 |
0 |
||
Clean Concrete Channel |
3166.73 |
323.5 |
||
Clean Culvert / Bridge |
1245.83 |
111.05 |
||
Clean Earthen Channel |
276.25 |
0 |
||
Clean Flume |
417.81 |
4 |
||
Clean Inlet |
520.65 |
80.9 |
||
Clean / Grade Bar Ditch |
65 |
0 |
||
Contract Inspection |
222.25 |
0 |
||
Culvert Inspection |
139.69 |
4.35 |
||
Debris Removal |
210.25 |
30 |
||
Dirt & Mud Removal |
299.75 |
36 |
||
Drainage Pipe Repair |
87.75 |
0 |
||
Field Inspection
Field Inspection ( No Condition )
|
293.42 |
0 |
||
Graffiti Clean Up |
54.73 |
0 |
||
Guardrail Maintenance |
2.5 |
0 |
||
Hydro Excavation |
198 |
10.5 |
||
Illegal Dumping Response |
55.75 |
0 |
||
Inlet Decal Install |
91.81 |
0 |
||
Inlet Inspection |
1576.421 |
0 |
||
Larvicide Dunk |
15 |
0 |
||
Lid Replacement |
34.11 |
0 |
||
New Drainage Construction |
0 |
0 |
||
On-Call
On-Call ( Call Back )
|
237 |
0 |
||
PCC - Sidewalk Repair |
197 |
0 |
||
Pipe Inspection - Emergency Callout |
33.5 |
0 |
||
Pipe Inspection - Engineer Project |
1.5 |
0 |
||
Pipe Inspection - Maintenance Issue |
125.75 |
0 |
||
Pipe Inspection - Postconstruction |
68.5 |
0 |
||
Pipe Inspection - Preconstruction |
367.25 |
0 |