MCM 1 : MS4 MAINTENANCE ACTIVITIES
I .
Structural Controls
The Stormwater Maintenance Crew maintains the stormwater conveyance infrastructure , i . e . the
stormwater conveyance infrastructure that is within the city ’ s rights-of-way including , major bridges ,
culverts , inlets and barrow ditches .
The crew performs inspections to identify maintenance and repair
needs . The crew accomplished the following during the reporting period :
Activity
Labor Hours
Debris Hauled / Removed ( yd 3 )
Bridge Deficiency Repair
334.75
42
Channel / Flume Inspections
629.47
0
Clean Concrete Channel
3166.73
323.5
Clean Culvert / Bridge
1245.83
111.05
Clean Earthen Channel
276.25
0
Clean Flume
417.81
4
Clean Inlet
520.65
80.9
Clean / Grade Bar Ditch
65
0
Contract Inspection
222.25
0
Culvert Inspection
139.69
4.35
Debris Removal
210.25
30
Dirt & Mud Removal
299.75
36
Drainage Pipe Repair
87.75
0
Field Inspection
Field Inspection ( No Condition )
293.42
0
Graffiti Clean Up
54.73
0
Guardrail Maintenance
2.5
0
Hydro Excavation
198
10.5
Illegal Dumping Response
55.75
0
Inlet Decal Install
91.81
0
Inlet Inspection
1576.421
0
Larvicide Dunk
15
0
Lid Replacement
34.11
0
New Drainage Construction
0
0
On-Call
On-Call ( Call Back )
237
0
PCC - Sidewalk Repair
197
0
Pipe Inspection - Emergency Callout
33.5
0
Pipe Inspection - Engineer Project
1.5
0
Pipe Inspection - Maintenance Issue
125.75
0
Pipe Inspection - Postconstruction
68.5
0
Pipe Inspection - Preconstruction
367.25
0
CITY OF ARLINGTON TPDES STORMWATER ANNUAL REPORT – FY 2018