22 SHOP NOTES Masonry Shop The masons were very busy at the Power Plant fall semester. Masons laid block and brick around a new door frame, poured exterior concrete steps, did some repointing, laid brick around a new window, cut out joints on an exterior wall and repointed it, bricked up a window, and cut a hole in a wall for an air conditioning unit and relaid the bricks after it was installed. Outside the Carpentry Shop, they poured a concrete slab and laid block on it for foundation walls to be used for carpentry framing projects. They built scaffolds at J [