22
SHOP NOTES
Masonry Shop
The masons were very busy at the
Power Plant fall semester.
Masons laid block and brick around
a new door frame, poured exterior concrete steps, did some repointing, laid
brick around a new window, cut out
joints on an exterior wall and repointed
it, bricked up a window, and cut a hole
in a wall for an air conditioning unit and
relaid the bricks after it was installed.
Outside the Carpentry Shop, they
poured a concrete slab and laid block
on it for foundation walls to be used for
carpentry framing projects.
They built scaffolds at J [