The Grit WINTER 2021 | Page 5

Weetalaba — LDC ’ s third rehydration site
Havilah gully repair helps the neighbours too
Strathmore gullies no longer gullies after Wet
Two Glen Bowen sites successfully repaired
e partnerships : Working with many

THE grit

Weetalaba — LDC ’ s third rehydration site

The Mulloon Institute is designing a costeffective way to address a erosion hotspot on Weetalaba Station to help hold and keep water on the property .

Havilah gully repair helps the neighbours too

LDC ’ s fifth large-scale gully remediation site is at Havilah Station . Works are expected to start in July .

Strathmore gullies no longer gullies after Wet

Strathmore Station near the Bowen River rodeo grounds is LDC ’ s fourth large-scale gully . The remediated sites have responded well following the wet season .

Two Glen Bowen sites successfully repaired

The LDC project ’ s second and third large-scale gully remediation sites were on Glen Bowen Station . Neilly Group Engineering designed the remediation measures .
Issue 24 , Winter , 2021 , June | P5