The Grit December 2019 | Page 21

MT WICKHAM, PHASE TWO... A dozen rock structures were constructed as part of phase two of the gully remediation project. The chutes were designed to intercept flows and reduce flow rate. RIGHT: NQ Cultural Heritage’s Michele Bird, left, LDC project manager Lisa Hutchinson, Birriah cultural officer Algon Walsh and Glen Bowen Station owner Christian Cormack. LEFT: GLEN BOWEN STATION work begins. Far left: before the machinery moved in, and, left, nearing completion. Grit, Issue 17, December, 2019 | P21