Eight tips for a successful wind project
Any wind turbine, whether it be 11kW
or 500kW in size, will be economically
beneficial if positioned on the right site.
By following eight simple rules, farmers
and landowners can make sure they find
the right site for their wind project, says
land agent Chesterton Humberts.
A good wind speed of over 4.9m/sec can
be viable
Clean, non-dispersed wind with no
turbulence
Grid connection - three-phase is required
for most wind energy projects over 10kW
Short cabling route
Relatively easy vehicular access for
delivery and maintenance
A set "distance buffer" from houses and
linear habitat features, in accordance with
government guidance
A site next to a listed building, in a
conservation area, or in an Area of
Outstanding Natural Beauty (AONB),
is likely to encounter difficulties when
trying to obtain planning permission
Outside any MoD or telecommunications
aviation zone.
Welcome to Chickenguard
Welcome to Chickenguard,
in the download section, combined
manufactures of Automatic Chicken with our unique, fully featured LCD
Door Openers. We have a range
display, helps to make our Automatic
of Pop Hole Door Openers to suit
Door Opener the easiest to set-up
every need and budget utilising the and go.
very latest in microprocessor control Our AS Series Pop Hole Door
technology. With Integrated Timer Openers give you the peace of mind
and Light Sensor fitted as standard and security that your little darlings
on all our Pophole Openers, you can deserve and help to put some of the
relax in the knowledge that your
fun back into keeping chickens, as
hens will be safely looked after.
let’s face it, we love our chickens,
Straight forward installation and ease but the daily rush back to lock them
of use are of paramount importance away safely at night isn’t much fun
– you only need to know how to
and realising that you have forgotten
operate a screwdriver! Easy to
after you have retired to bed is
follow instructions, available to v