ON SITE permits the overlap to take place,” he explains. The precast sections are manufactured with holes through which cables, with a maximum of 5mm play, are threaded and later post-tensioned to keep the wall panels tightly in place, using Corestruc’s unique methodology. While conventional construction methods use reinforcing and post- tensioning to control applied forces, Corestruc’s method uses tensioning vertically and horizontally to resist applied forces. About 6.6km of post- tensioning ducts and cables were installed by hand between the joints of the wall panels, before the grout was pumped around the circumference of the reservoir. This is a vital component of the construction project and the team has to pay meticulous attention to detail to avoid potential future leakages that have been so common in the past using less-sophisticated precast-concrete technologies. The voids between the panels are sealed using a specially designed grout that is pumped between the precast- concrete wall slabs. This grout has been designed to reach a compressive strength of 100Mpa within four days — stronger than the concrete of 70Mpa — and to further react when the medium comes into contact with water when the reservoir is being filled. It is blended and packaged on behalf of Corestruc by Epoxerite, a South African construction chemicals specialist. Self-healing concrete is used for the grouting, which enables the concrete over time to grow tentacles into surrounding concrete surfaces. This is Corestruc’s own design, explains De Jager, which leaves ‘pure’ un-hydrated cement inside the mix into which the tentacles can expand. The company also designed its own post-tension grout as part of its seamless methodology. “It is an extremely high-flow grout to flow through all the post-tensioning ducts while being pumped from a single position.” The success is achieved in the installation, whereby the open time is extended by cooling the grout www.civilsonline.co.za down to 7 ° C — or the grout would set in 30 minutes. This method — which is similarly applied to the roof — forms a single monolithic unit. What could go wrong but doesn’t The trick lies in careful installation, explains De Jager, as each panel weighs between 8t and 11.5t, which means safety is a priority. The process is constantly monitored using a Total Station that enables each panel to be placed with miniscule error. A ‘prism’ using GPS coordinates is used to place each slab by crane. If it is out of kilter by even 5mm, the installation will not work, as a bolt in the steel plate grouted in place on top of the ring beam in the structure has to align with a hole in the slab to 5mm accuracy, while steel plates at the top have to similarly line up. “The crane is equipped with a load-moment indicator, but requires expert human rigging to ensure accurate and safe installation. If it doesn’t fit, you know you have a problem. If the gaps between each panel are even slightly too large, then the last panel won’t fit.” However, says De Jager, “It never happens.” Bezuidenhout confirms this, lauding the precision of the process and noting that the final panel fitted perfectly. “Over the years, we’ve been through the school of hard knocks,” says De Jager. “Through experience we have been able to refine our systems and quality control to the extent that we predict problems before they occur. For instance, the 3D prints didn’t work well on a The view from Mathysenloop is hilly and scenic, with numerous reservoirs visible on surrounding hills. This project is but one of a series of 10Mℓ reservoirs being constructed in the area. CEC March 2019 | 23