Debarrier for hydro scheme
Water monitoring systems
Water and wastewater services for Windhoek
New academic conference centre at GSB
ON CONSULTANTS’ DESKS
Debarrier for hydro scheme
Project: Client: Location:
Water, power grid Jiro Sy Rano Malagasy Madagascar
Jiro Sy Rano Malagasy( Jirama) hereby invites successful candidates to submit sealed bids for the design, supply, assembly, and commissioning tests( turnkey) of a debarrier at the dam of the Andekaleka hydroelectric power station. The works are inseparable and offers for part of the facilities will be rejected.
Water monitoring systems
Project: Client: Location:
Consultants, IT & Telecom Ministry of Water Resources Ethiopia
Addis Ababa Rivers, Riversides Development and Climate Change Adaptation Project Office( ARRDCAPO) invites all interested and eligible bidders by this International Competitive Bid( ICB) for the procurement of supply, installation, commissioning, and operation services of continuous water quality and water level monitoring systems as well as data connectivity at selected stations on the river of Addis Ababa.
Addis Ababa is looking to install continuous water quality and water level monitoring systems. www. hotelroomsearch. net A Lyons adventures in Namibia
The services included under this project are specialised engineering and financial investigation of the water and wastewater services of the City of Windhoek.
Water and wastewater services for Windhoek
Project: Client: Location:
Water, institutional City of Windhoek Namibia
The Republic of Namibia has received financing from the African Water Facility towards the cost of the Windhoek Integrated Water and Wastewater Master Plan( WIAWMP) and intends to apply part of the agreed amount for this grant to payments under the contract for consulting services for WIAWMP. The services included under this project are specialised engineering and financial investigation of the water and wastewater services of the City of Windhoek. The objective is to provide a strategic master plan document with a vision for the sustainable development and operation of water and wastewater facilities for City of Windhoek. The studies further include hydraulic modelling of the water and wastewater bulk and reticulation networks and aim to provide an operational document dictating the required works, costs, impacts, and sequence of investment for the required water and wastewater infrastructure. It also includes the detail design of a priority investment. The project duration is approximately 30 calendar months.
New academic conference centre at GSB
Project: |
Building and civils |
Client: |
Graduate School of Business( GSB) |
Location: |
Cape Town |
The Graduate School of Business( GSB) at the V & A Waterfront campus, Cape Town, in the Western Cape, is planning the construction of a new multi-level academic conference centre and associated external works. The work will incorporate the construction of a 200-seater basement lecture theatre; above-ground lecture and research rooms; and social spaces, all distributed over four levels and measuring approximately 2 600m ²: The building is designed as a Green Star 4 rating facility and will incorporate the following: Bulk excavation www. news. uct. ac. za
Part of the V & A Waterfront campus; the new building will be a Green Star 4 rating facility.
for basement approximately 900m ², basement construction including ground anchors and reinforced concrete retaining walls, reinforced concrete foundations and structure to ground, first and second floors, structural steel structure with glazed facade to second floor, domestic plumbing, electrical distribution and air-conditioning services, concrete and steel roof structure with metal sheeting and skylights, external paving, and landscaping. Approximately R82-million.
6- CEC June 2018