Test Drive | Page 16

FROST BANK HARRISBURG PM: Pat Garrett Super: Jim Shaw PC: Connie Enmon E: Dave Ogden The Frost-Bank Harrisburg location is one of the main resources for the Frost Bank Houston with all daily transactions being accounted for here. The original bank building had to be kept open until an adjacent building could be renovated to accommodate the operations of the bank. This was a 1,675 SF ground up construction consisting of lobby, teller work area, office spaces, and a three lane drive area. The exterior primary construction materials included limestone veneer, stucco, aluminum storefront, and Alucobond metal panels. The interior of the building was finished with carpet tile, ceramic tile, wood veneer ceilings with exposed trusses and limestone and painted walls. BMW VEHICLE PROCESSING CENTER PM: Glenn Jarrett E: DeWayne Lucas Super: Brad Black & Marcelino Perez PC: Debbie Shelton The BMW Vehicle Processing Center is a design + build project that was done at the Port of Galveston. The new 35,900 SF building is a vehicle processing center for all of the new inventory and a 10,700 SF body shop and car wash. Both of the buildings are pre-engineered metal buildings with metal panel and split face CMU exterior facades. The vehicle processing center can accommodate over 50 vehicles and has multiple offices, a break room and parts department. The new facility had there first shipment of cars come in January 2016.