FROST BANK
HARRISBURG
PM: Pat Garrett
Super: Jim Shaw
PC: Connie Enmon
E: Dave Ogden
The Frost-Bank Harrisburg location is one of the
main resources for the Frost Bank Houston with
all daily transactions being accounted for here.
The original bank building had to be kept open
until an adjacent building could be renovated to
accommodate the operations of the bank. This was
a 1,675 SF ground up construction consisting of
lobby, teller work area, office spaces, and a three
lane drive area. The exterior primary construction
materials included limestone veneer, stucco,
aluminum storefront, and Alucobond metal panels.
The interior of the building was finished with carpet
tile, ceramic tile, wood veneer ceilings with exposed
trusses and limestone and painted walls.
BMW VEHICLE
PROCESSING CENTER
PM: Glenn Jarrett
E: DeWayne Lucas
Super: Brad Black & Marcelino Perez
PC: Debbie Shelton
The BMW Vehicle Processing Center is a design +
build project that was done at the Port of Galveston.
The new 35,900 SF building is a vehicle processing
center for all of the new inventory and a 10,700 SF
body shop and car wash. Both of the buildings are
pre-engineered metal buildings with metal panel
and split face CMU exterior facades. The vehicle
processing center can accommodate over 50
vehicles and has multiple offices, a break room and
parts department. The new facility had there first
shipment of cars come in January 2016.