FEATURE
PICTURES: CHRIS BOOTH
Co-founder Matty Carlin( left) and CEO Peter Wilcock at the site of Stockton’ s new Latos data centre.
Teesside construction underway for £ 100m Latos data centre
BRITAIN BUILDS ITS OWN
AI BACKBONE
Ground has been broken in Stockton on a £ 100m neural edge data centre designed to keep British data on British soil, put the Tees Valley at the heart of the nation’ s AI ambitions and give the UK a homegrown alternative to the US hyperscale giants.
Every business has a story about where its data lives. For too many British organisations, that story ends somewhere across the Atlantic, in a facility owned by a company answerable to a foreign legal system. Latos exists to change the ending.
As a UK business, building UK infrastructure, Latos gives government departments, councils, health bodies and regulated industries something that has been hard to find: AI compute that is British-owned, British-sited and governed under British law. Data stays inside the UK’ s borders, from the moment it is created to the moment it is processed.
That matters more every year. Sovereignty now sits among the top three factors UK organisations weigh when choosing infrastructure, alongside cost and performance, and it is a preference that tends to harden rather than fade as AI moves from experiment to everyday operation.
Stockton has been reinventing Britain’ s industry for two centuries, from the birthplace of the modern railway to the chemical and process engineering that built Teesside. The next chapter is being written on Preston Farm Industrial Estate, in the shape of a £ 100m neural edge data centre.
The new Latos site is built on brownfield land inside the North-East AI Growth Zone, the government’ s designation for places chosen to anchor the country’ s AI buildout, with fast-track planning and priority access to power. Around it sits a region with a deep engineering talent base, the Centre for Process Innovation and a growing reputation for start-up activity.
Latos is committed to prioritising North- East suppliers and contractors through construction, so the benefit lands locally long before the first GPU is switched on. Once live, the facility gives regional manufacturers, health providers and digital scale-ups something they have never had on their doorstep: frontier-grade AI compute, minutes from their own front doors.
The UK designated data centres as Critical National Infrastructure in 2023, and for good reason. A country whose AI, public services and economy run on a handful of giant campuses, concentrated in a few hubs and controlled overseas, carries a concentration risk it cannot easily see until something goes wrong.
Latos takes the opposite approach. Neural edge sites are compact, distributed and close to the people they serve, which means answers arrive in milliseconds rather than seconds and services keep running when a distant hub does not. Stockton is the first of a planned national network of around 20 sites by 2030, each one adding another node of UK-controlled capacity.
It is also designed to be a good neighbour. The facility draws 15MW from the local grid, uses closed-loop water cooling that recirculates rather than consumes, runs at a low noise profile and is supplied by renewable power.
The hyperscalers are extraordinary companies and they will remain part of Britain’ s digital landscape. But they are built for training giant models at gigawatt scale, often under foreign jurisdiction and competing hard for the same scarce grid capacity.
Latos is built for something different: inference, the everyday running of AI that happens millions of times a day and has to happen close to the user.
48 | Tees Business