Surface World November 2019 Surface World November 2019 | Page 64

PRODUCTS & PROCESSES The targets for the new system were set quite high 4 m tall products with a line speed of up to 3,5 m/min Highly efficient powder application Consistent and uniform 25 microns of coating thickness Full automatic coverage of the shelving corners Fast color change for flexible production Clean, environmentally-friendly work place Once the specifications were defined, the team started the supplier selection. “We knew our requirements were challenging, so we were looking for a supplier with demonstrated abilities to design a system to match our needs and reliably support our production.” Says Lyndon Clean, environmentally friendly operating conditions. Woodfield, Sr. Team Leader, Manufacturing, who has extensive powder coating experience with Link 51’s old line. Link 51 team knew about the positive experience at their two sister-plants, Lockers and Pallet Racking, which were using the new dense-phase powder delivery technology from Nordson. So, the team headed to the suburbs of Dusseldorf, to experience the new spray systems first-hand at the Nordson demonstration center. “It’s nice to test the equipment with our products and powder.” Says Tom Clayton. “Since I was to operate the new system, having a chance to work with it without the pressure of running production was important.” “A few days of testing at Nordson helped us gain confidence in the attainability of our goals. Their solution was easy to work with and was proven to apply highly controlled coating thickness with no operator intervention. Process control was important for our production efficiency.” Recalls Christopher Walker. “Additionally, Nordson offered a special booth allowing Tom to clean it from the top down using convenient, high-level openings with platforms. That made good sense to us.” Because of the Intuitive controls simplify operator work and guide colour change. close team work, demonstrated abilities, and the special booth solution, Nordson was awarded the order for Link 51’s new powder coating system with the target to install in late December 2018 and start of production on January 6th – just 3 weeks later. “Those were intense weeks.” Recalls Lyndon Woodfield. “In only one week we had to take out the old system, fill the pit, seal the floor and have the area ready for Nordson’s installation team. A large booth with 20 automatic guns had to be ready for production just 2 weeks later”. Startup 4 days ahead of schedule All involved worked like clockwork. From demolition to installation to startup, Link 51 and Nordson teams worked double-shifts. On January 2nd, 4 days ahead of schedule, the first batch of powder coated shelves came off the line and everyone could breath a sigh of relief. “A couple of weeks prior to the start of the installation, our team spent 3 days at Nordson in Germany learning to work with the equipment. We passed the learning curve at high speed while at Nordson. On day one we were ready to hit the ground running and run full production.” – remembers Woodfield. The new system features a custom- engineered, 6,5 m tall ColorMax ® booth with a Spectrum ® HD powder feed center and advanced controls. The booth is designed to provide reliable powder containment while also ensuring soft airflow in the spray area. Special high-level openings with platforms enable operators to clean the booth walls from the top down. This way, no powder is blown in the direction of the conveyor opening against the booth airflow. The automatic floor cleaning system keeps the powder in the booth to an absolute minimum. The high line density combines with the efficient powder application resulting in minimum overspray. Any airborne powder is efficiently recycled through a twin-cyclone system and screened through an ultrasonic sieve prior to being returned to the fully enclosed feed center. The new system also delivers on the fast, contamination-free colour change. “The step-by-step colour change instruction on the main controller and many of the colour change tasks being fully automated, makes my work much easier” – confirms Tom Clayton. The new system operation Since commissioning of the powder coating plant, Link 51 team took full ownership of the process. With the support from the local Nordson personnel, the applied coating and 62 NOVEMBER 2019 read online: www.surfaceworld.com