Surface World February 2019 SW_Feb_2019_LR | Page 40

OVENS, SPRAYBOOTHS & PROCESS HEATING Dales Fabrications Ltd choose Haviland In the spring of 2018 Dales Fabrications Ltd of Ilkeston, manufacturer of aluminium rainwater goods, fascia, soffi ts and external building shades, contacted Haviland with a view to upgrading their powder coating facility. The brief was to provide a pre-treatment system and powder coating facility with a specification that could satisfy the industry- respected approval standards of Syntha Pulvin, this being the standard that Dales set to establish the suitability of their third-party powder coaters. The constraints were to fit the whole of the plant within a footprint of 144²m, this being a new facility adjacent to their existing production plant. Over the next few months various layouts were developed culminating in the one shown. A concept incorporating dip tanks with powered overhead gantry system, progressing baskets of components through an Okemcoat-4500 ® wet pre-treatment with oven dry, and from there, transferred to an overhead conveyor provided with flight bars to marshal products into the powder booth and gas fired oven for eventual unloading adjacent to despatch. Dales products consists of a number of aluminium extrusions, large contoured panels and bracketry, the maximum length of which to be processed was agreed at 3m. These products arrive in the WIP area to unload on pallets and then loaded into a basket which enables products to be loaded at an angle to help drainage when passing from one tank to the next. A gantry system was designed specifically for the process connects to the baskets. Operators can then progress the product through heated Gardacid ® etch/de-grease, towns water rinse, de-mineralised water rinse and then Okemcoat-4500 ® . Chemetall, part of the BASF group, manufacture and provide both of the pre-treatment chemicals relating to this project, Gardacid ® and Okemcoat-4500 ® . Finally, products enter a low temperature electrically heated air recirculated top loading process oven for drying. Haviland provided the services to the system, which included mains water, a demineralised water plant with a holding tank, electrical services and mains drainage. Product Marshalling From the pre-treatment to powder booth a push/pull overhead conveyor system was installed, this enabled the products to be transferred onto specially manufactured flight bars. The flight bars transferred to the powder coating booth with the conveyor mounted centrally at high level. The booth was designed to be operated with low level extraction at the rear, provided by a fabric extraction system. The booth was also designed to accommodate larger complete fabrications. Lighting within the enclosure is provided by LED strip lighting. Operators have access to both sides of the conveyor. The powder application system incorporating a GEMA Optiflex gun. On completion of the powder coating the flight bar is progressed to the powder coating oven, here the conveyor system splits in a “Y” section to enable flight bars to be presented in the oven at 90°, this enables the oven hot zone to be completely filled. CONTINUED ON PAGE 40 38 FEBRUARY 2019 read online: www.surfaceworld.com