[ Architecture Building Construction ]
[ Architecture Building Construction ]
World’ s tallest building relies on German engineering
With a spectacular height of over one kilometre, the Jeddah Tower in Saudi Arabia will eclipse all previous human constructions once completed. In addition to its impressive dimensions, German precision is also evident in what will be the world’ s tallest building: fischer products ensure that Jeddah Tower grows safely into the sky.
By Joanne McIntyre, Stainless Steel World
Where ancient trade routes meet a modern megacity, Saudi Arabia’ s new landmark is rising. Jeddah – once a modest port – has catapulted itself into a vibrant metropolis in just five decades. Today, the city is a melting pot of tradition and technology, bazaar and business, past and vision. Nothing makes this clearer than the city’ s great tower, which is currently under construction: Jeddah Tower will cost more than one and a half billion euros and is scheduled for completion in 2028. Its proximity to the Red Sea will make it a gigantic beacon for a region that is currently reinventing itself. And right in the middle of it all: the fischer Group of Companies. The fastening pioneer from the northern Black Forest is supplying steel and chemical products for the mega-project.
From the Black Forest to the Red Sea The company’ s experts are on site and will accompany those involved in the construction until the project is successfully completed. The Jeddah Tower is one of a series of world record-breaking buildings featuring fischer solutions. These include the‘ Ain Dubai’, the world’ s tallest observation wheel; the Burj Khalifa, at 828 metres the current leader among the world’ s skyscrapers; the Louvre Abu Dhabi museum with its striking architecture – and many other landmarks in the region.“ Being selected for the Jeddah Tower is a testament to our engineering excellence and our commitment to the region,” says Osama Farhat, General Manager Sales KSA at fischer.
“ Our chemical and steel anchors were chosen not just for their loadbearing capacity, but for their proven reliability in extreme conditions. We provide the safety and precision that a project of this height demands, ensuring that our solutions meet the rigorous standards required for the world’ s tallest building.”
Stainless steel usage and corrosion protection strategy The project utilises AISI 316 and AISI 316L stainless steel for components requiring enhanced corrosion resistance and long-term durability in the aggressive coastal environment. These grades were selected primarily due to the projects’ location, where it will be exposed to significant levels of airborne chlorides originating from the Red Sea marine environment. Jeddah is exposed to a C5 corrosivity environment, characterised by very high atmospheric corrosion risk due to its coastal location. Key corrosion challenges include:
• Chloride-rich marine atmosphere
• Salt-laden airborne contaminants
• High humidity levels
• Elevated ambient temperatures
• Long design service life requirements
• Continuous exposure of external components to harsh environmental conditions
These factors create a demanding environment where material selection and corrosion protection systems are critical to ensuring long-term performance. The molybdenum content of 316 / 316L stainless steel provides superior resistance to:
• Chloride-induced corrosion
• Pitting corrosion
• Crevice corrosion
• General atmospheric corrosion in marine environments
In addition, these grades offer excellent long-term durability and reduced maintenance requirements, making them suitable for structures with extended design service lives.
Unique components The fischer team brings several unique capabilities to the project, including the FIS EM Plus Epoxy Injection Mortar for post-installed rebar( planted reinforcement) applications. This high-performance chemical anchoring system is specifically designed for heavy-duty structural applications and provides exceptional reliability in demanding conditions. Key advantages include:
• High load-bearing and bond performance
• Excellent long-term durability, with an ETA-assessed service life of up to 100 years
• Reliable performance in cracked and non-cracked concrete, including seismic applications
• Suitable for demanding structural and reinforcement connection applications
Additionally, the FAZ II Plus M16 Mechanical Expansion Anchor was selected for fixing the safety-line boundary system, where exceptionally high loads were required. To validate performance under project conditions, pull-out testing was conducted on site. The anchor achieved a load exceeding 2 tonnes without failure, demonstrating the required safety margin and reliability.
Challenging construction A building of this scale presents many construction challenges for the stainless steel components. One of the most critical is wind-induced structural
42 Stainless Steel World October 2026 www. stainless-steel-world. net