Stainless Steel World Magazine March 2024 | Page 33

[ Wastewater ]

[ Wastewater ]

also included . They neatly worked out our sketch with dimensions and specifications into 3D models , which we received for verification . After this phase , the tanks went into production . At the end of the production process , we were invited for the factory acceptance to view and check the tanks . It was impressive to be able to see the production process of these and other tanks up close .”
Collaboration “ We are satisfied with the quality and cooperation . It has been a streamlined process where quality was monitored and recorded throughout the production process . After production , we received complete documentation for each tank : the drawing , material list , certificate , user instructions , and quality reports . Gpi is a fine company with skilled employees who go for quality and know how important cooperation and good communication are .’
The result The client discusses the result and the plan for the future : “ We plan to
Due to the corrosive conditions underground , the 316L tanks have been treated with a highly wear-resistant and corrosion-resistant coating .
systematically replace our collection tanks in the coming years . In addition , we have already initiated a follow-up order for two more tanks . Each new tank entails its own project , wherein we meticulously inspect the pumps , power supply , and control systems . Once installed , the tanks are completely underground , except for the access hatch . While
they may no longer be visible after installation , being situated underground , the tanks remain a vital component of our sewer system . They are an indispensable part of a properly functioning sewer system . With the addition of the new stainless steel tanks , our vacuum sewer system will be reliable and sustainable .’
www . stainless-steel-world . net Stainless Steel World March 2024 33