Space Heritage June 25, 2014 | Page 7

STANDARD HIGH RELIABILITY TEST FLOW FOR RF COMPONENTS GROUP A TESTING AND INSPECTION (100% of the lot) Pre-cap Visual Inspection Conductor Metallization Defects Resistor Defects Substrate Defects Foreign Material Visual Mechanical Inspection Electrical Inspections Electrical Performance Thermal Shock Electrical Performance Burn-In [100% 168 hours at input power] Final RF Test Percent Defective Allowable (PDA) Temperature Coefficient of Attenuation GROUP B TESTING AND INSPECTION (Sample) Subgroup 1 (sample) Low Temperature Operation Electrical Performance High Temperature Bake Visual Mechanical Inspection Electrical Performance Termination Adhesion (Planar, W1, W3 only) Bondability (WB1 and G only) Termination Solderability (Planar, W1, W3, T3 and T3S only) Terminal Lead Strength (T3 and T3S only) Subgroup 2 (sample) Electrical Performance Life Test. Sample units for 1000 hours at the maximum input power specified Electrical Performance GROUP C TESTING AND INSPECTION (Sample) Electrical Performance Load Life. Burn-in units at 125°C for duration of 1000 hours at maximum input power specified. Electrical Performance Data Review and Data Pack ADDITIONAL RF COMPONENT TESTING AVAILABLE: Stability of Attenuation After: Temperature Change Thermal Shock Vibration Shock Moisture Resistance Peak Power Salt Spray Sensitivity of Attenuation After: Change in Input Power Change in Frequency Change in Temperature Vibration and Shock Testing Moisture Resistance Peak Power Salt Spray Barometric Pressure Outgassing Endurance Resistance to Bonding Exposure Low Temperature Operation Short Term Overload High Temperature Exposure Solderable Mounting Integrity Bondable Mounting Integrity Resistance to Solvents Gross and Fine Leak Detection Radiographic Inspection First Article Inspection Pre-Cap Inspection Source Inspection Other testing services are available upon request. STANDARD HIGH RELIABILITY TEST FLOW FOR CABLE PRODUCTS TESTING AND INSPECTION (100% of the lot) Visual Mechanical Inspection Materials Finish Configuration and Features Mechanical Definition Verification (Fit Fixtures), as required Mechanical Master, as required First Article Inspection Marking Mating Workmanship ADDITIONAL TESTING AND SERVICES AVAILABLE: Electrical Inspections Pre-Conditioning DWV (Dielectric Withstanding Voltage) Electrical Performance VSWR & Insertion Loss Thermal Shock Electrical Performance Serialized Data (as required) Insertion Loss (read & record) VSWR (read & record) X-Ray Inspection (as required) Data Review and Data Pack Supplied Phase Matching Vibration and Shock Moisture Resistance Peak Power Salt Spray Corrosion Barometric Pressure Resistance to Solvents Force to Engage/Disengage Cable Forming Custom Painting Custom Marking Custom Packaging & Packing Source Inspection Other testing services are available upon request.