STANDARD HIGH RELIABILITY TEST FLOW FOR RF COMPONENTS
GROUP A TESTING AND INSPECTION
(100% of the lot)
Pre-cap Visual Inspection
Conductor Metallization Defects
Resistor Defects
Substrate Defects
Foreign Material
Visual Mechanical Inspection
Electrical Inspections
Electrical Performance
Thermal Shock
Electrical Performance
Burn-In [100% 168 hours at input power]
Final RF Test
Percent Defective Allowable (PDA)
Temperature Coefficient of Attenuation
GROUP B TESTING AND INSPECTION (Sample)
Subgroup 1 (sample)
Low Temperature Operation
Electrical Performance
High Temperature Bake
Visual Mechanical Inspection
Electrical Performance
Termination Adhesion (Planar, W1, W3 only)
Bondability (WB1 and G only)
Termination Solderability (Planar, W1, W3,
T3 and T3S only)
Terminal Lead Strength (T3 and T3S only)
Subgroup 2 (sample)
Electrical Performance
Life Test. Sample units for 1000 hours at the
maximum input power specified
Electrical Performance
GROUP C TESTING AND INSPECTION (Sample)
Electrical Performance
Load Life. Burn-in units at 125°C for duration
of 1000 hours at maximum input power specified.
Electrical Performance
Data Review and Data Pack
ADDITIONAL RF COMPONENT TESTING AVAILABLE:
Stability of Attenuation After:
Temperature Change
Thermal Shock
Vibration
Shock
Moisture Resistance
Peak Power
Salt Spray
Sensitivity of Attenuation After:
Change in Input Power
Change in Frequency
Change in Temperature
Vibration and Shock Testing
Moisture Resistance
Peak Power
Salt Spray
Barometric Pressure
Outgassing
Endurance
Resistance to Bonding Exposure
Low Temperature Operation
Short Term Overload
High Temperature Exposure
Solderable Mounting Integrity
Bondable Mounting Integrity
Resistance to Solvents
Gross and Fine Leak Detection
Radiographic Inspection
First Article Inspection
Pre-Cap Inspection
Source Inspection
Other testing services are available upon request.
STANDARD HIGH RELIABILITY TEST FLOW FOR CABLE PRODUCTS
TESTING AND INSPECTION (100% of the lot)
Visual Mechanical Inspection
Materials
Finish
Configuration and Features
Mechanical Definition Verification
(Fit Fixtures), as required
Mechanical Master, as required
First Article Inspection
Marking
Mating
Workmanship
ADDITIONAL TESTING AND SERVICES AVAILABLE:
Electrical Inspections
Pre-Conditioning
DWV (Dielectric Withstanding Voltage)
Electrical Performance
VSWR & Insertion Loss
Thermal Shock
Electrical Performance
Serialized Data (as required)
Insertion Loss (read & record)
VSWR (read & record)
X-Ray Inspection (as required)
Data Review and Data Pack Supplied
Phase Matching
Vibration and Shock
Moisture Resistance
Peak Power
Salt Spray
Corrosion
Barometric Pressure
Resistance to Solvents
Force to Engage/Disengage
Cable Forming
Custom Painting
Custom Marking
Custom Packaging & Packing
Source Inspection
Other testing services are available upon request.