Souleles Resume + Portfolio 2018 portfolio-resume 2018 | Page 57

SAIT Polytechnic Parkade In collaboration w/ Bing Thom Architects 2007 - 2010 - Calgary AB | Phases | | | | Client | Value | Comp. | Area | Role Project Architect Schematic Design Design Development Contract Documents Tendering + Construction SAIT $85 million 2009 73,980 sq. ft. The SAIT Parkade and Playing Field is a 1,100 stall parking structure situated on and under a ceremonial field frontingHeritage Hall. Predominant features include a ceremonial glass atrium vestibule that marks the entry and exit in the heart of the campus; a custom designed p unched metal screen system that utilizes the residual metal tabs to incorporate a graphic image; the artistic tooling, manufacturing and installation is the first of its kind; the new playing surface incorporates storm water retention strategies; and the road system includes a roundabout to control traffic when accessing and departing the facility. MTA is the Architect of Record. My primary function was to assist BTA in co-design, the schematic/design development of the Parkade inclusive of screen and atrium. This included design refinement, building envelope development w/ emphasis on regional conditions, and to strive for a consistent execution of the concept design. In addition, my team proceeded to author the working drawings and specifications and executed the contract through to construction.