Shaw Book - Volume 1 Mar. 2016 | Page 178

172_193WaterFeatures 10/22/04 1:16 AM Page 176 Koll Center South, Irvine, CA Thin set tile was placed directly over waterproofed, formed concrete weir sections. Weir/waterfalls section was formed with clear 2 by 4 attached to plywood back form on a 1-1/2-inch by 3-1/2- inch angle. 176 Plan view of palm entry fountain. Six water features built by Shaw & Sons at Koll Center South more than 20 years ago are still operating perfectly. Key components such as footing, grade beams, rebar placement with proper clearances, proper cement mix designs with special admixtures, final placement, consolidation and finish all play an important role in the longevity of water feature construction. It’s equally important that subgrade compaction, waterproofing, and mechanical / electrical / plumbing trades interface to ensure proper installation. Palm entry fountain. Jim Curtis, Bill Schulz, EDAW, INC., Landscape Architects Triangle fountain at the Union Bank Building in Irvine (opposite page) displays cast-in-place radius weir, tiled bottom and natural type II cement concrete walls with heavy sand blast finish.