152_165SubgradeFrmwrk
10/21/04
11:50 PM
Page 155
From the Presidential Library’s structural basement walls to the garden walls, the
same methodology is followed to achieve proper forming, tie spacing and framework.
All construction procedures must follow strict guidelines to prevent deviation and/or
form failure during concrete placement, resulting in a finished product that meets or
exceeds the architect’s plans and specifications.
Plaza seat wall, retaining wall, entry sign and hardscape type II and V cement, special reveal and tie layouts.
155
Radiused formwork, plaza seat walls, retaining walls, entry sign, reflection pool, and hardscape. Note that there are no exposed form ties.