M / S ‘ Finneco I ’ – the first of Finnlines ’ three new hybrid ro-ro vessels – was delivered on 28 April 2022 from the Jinling shipyard . The new ship will start operations in June , at first on the Bay of Biscay route between Kotka and Bilbao . The two other hybrid Finneco ships will soon follow as they , too , are ready for delivery to Finnlines in early summer of 2022 .
The three Finneco hybrid ro-ro vessels currently being delivered are part of a larger series of twelve hybrid ships ordered by Grimaldi Group and built by the Jinling shipyard in China .
seatec 3 / 2022 15