SCREW FASTENING INTERIOR FINISHING - English May 2021 | Page 53

���� ����
Interior finishing screws
INSTALLATION INSTRUCTIONS FOR EYE LAG CEILING FASTENING HANGER *
1 . Adjust the telescoping tubes to the proper lengths .
2 . Insert the Eye Lag screw into top slot .
3 . Insert wire into side of slot through the eyelet in the Eye Lag screw . Then bend the wire end down . Provide adequate length of wire to properly develop the required number of loops after twisting .
4 . Raise tool against the ceiling , rotate the pole tool until the Eye Lag screw is at least 1-1 / 2 " into the wood base material ( embedment varies for steel base material - CAUTION refer to Section : 3.3.4.3 for In steel additional base material details )., CAUTION stop turning : In before steel washer base material contacts , stop base turning material before to avoid washer stripping contacts of the base material steel . to avoid stripping of the base steel .
5 . Lower the tool about 2 " from base material surface as shown .
6 . Rotate the tool again to twist the wire . The pole tool may be turned by hand or by using a 1 / 2 " variable speed drill . CAUTION : If using drill , do not grip pole tightly with hand , but allow it to turn loosely . Reference Figures 2 and 3 for typical wire tying requirements .
End Connections Side Connections Face Connections
Connection Locations for Wood Applications * These are abbreviated instructions which may vary by application . ALWAYS review / follow the instructions accompanying the product .
www . hilti . com Interior finishing screw – Technical manual – 04 / 22 53