SA Roofing November 2018 // Issue 106 | Page 13

ADVERTORIAL: COVER STORY An aerial shot of Mediclinic Stellenbosch showcasing the use of the mega light gauge steel structure. Portions of the structure were assembled on a concrete slab and then lifted. ULTRA-SPAN ADVANTAGES • Elegant simple system with all members straight and true for a level roof. • Span capability from small low-cost to large 40m clear span commercial structures. • Ultra-Span trusses can be supplied in “kit-form” for low-cost housing or remote projects. • Longevity of product due to galvanised coating plus inherent properties of non-combustibility, resistance to borer and fungus attack. • Lower weight reduces transportation costs and improves handling and erection. • Ease of truss manufacture with screws and electric fixing tool directly on site or in factory conditions. www.saroofing.co.za roof was made simpler by assembling portions of the structure on a concrete slab and lifting the required sections into place, reducing cost of the amount of connections of the trusses to the concrete ring beams, opening new opportunity for services, such as water pipes and electrical cables, to be connected to the concrete ring beams and reducing torsional moments on the concrete ring beams,” explains Van Wyk. Since the tendering process stage, the project was driven by roof construction pro Kalahari Bruwer, managing partner and co-owner of Rooftek. “All designs, aspects and complications of the roof structure was discussed with MiTek, the architect, engineer and project manager on site prior to the final designs to eliminate most of the manufacturing and erecting challenges posed by the roof structure,” notes Bruwer. Manufactured in Rooftek’s factory, the roof trusses were transported to site which demonstrated well- planned project management. “The project management was administered with excellence and all relevant problems that occurred on site, like additional gable gladding details and gable overhangs, was resolved in a quick and provisional manner. Excellent communication via e-mail and site meetings involving all parties assisted in the completion of the structure,” says Bruwer. CLADDING // CONCRETE // INSULATION // STEEL // THATCH // TIMBER // TRANSLUCENT // WATERPROOFING // COMPONENTS NOVEMBER 2018 11