SA Building Review- 2026 SA Building Review: Volume 14 - 2026 | Page 55

PROJECT MDS Architecture and Boogertman + Partners
A central part of a bigger development
Westown Square and The Barn form part of the approved development rights for about 520 000m ² of bulk floor area within Westown’ s Urban Centre. This retail hub will be supported by several interconnected precincts and experiences, including residential apartments, a business park, commercial activities, and a private hospital to be developed over the next 10 – 15 years.
Fundamentum Property Group developed Westown. This catalytic investment, along with over R1 billion in roads and other infrastructure currently being constructed by the eThekwini Municipality in partnership with Fundamentum, has not only enabled Westown to commence but will also attract a further R14 billion in investment across the Westown development over the next decade. traditional, multi-level shopping centres that have dominated retail environments for decades. Westown Square adopts what McGillivray describes as a highstreet design approach, where the boundaries between shopping, socialising, and outdoor experiences blend seamlessly. The 48 000m ² retail centre features densely planted walkways, pergola-covered seating areas, and a mindful celebration of the surrounding Shongweni green belt. The central focus of the design is a town square inspired by traditional farm buildings surrounding a courtyard. Alongside the‘ high street’ interface, various side streets and lanes lead into the square, creating a lively gathering space.“ The somewhat irregular layout reflects the organic development of town centres with varied forms and spaces,” says Richards.
The project started in 2016 with the purchase of land from Tongaat Hulett, similar in size to the Umhlanga Ridge new town centre on the North Coast.
Breaking the mould of typical malls
The design primarily aims to create an open, permeable, and accessible space that encourages connection and interaction. This approach is immediately clear in the significant shift away from
www. sabuildingreview. co. za 53