Rice Today | Page 10

Academic Resource Center Renovation Theology Teacher Hubert Sanders and members of the Saint Kolbe Band assist at local Angels Place home. 2013 Day of Service 1 Day 650 Students 80 Staff Members 100 Parents 10 Local Charities 30 Locations Three of the five Birchler brothers (L-R) Keith ‘71, John ‘80, and Tom ‘72 with Michael Burwell Executive Director of Kids Against Hunger Coalition. They helped students and faculty pack 13,000 meals. 2,500+ Hours Worked 100 Rakes 210 Leaf Bags 13,000 Meals 800 Donors Members of the Saint Leo Band spent the morning packing food at Gleaners Food Bank. Artist rendering of the Academic Resource Center Opened in 1989 as the first major addition to the original school, the nearly 6,000 square foot library housed the school’s hardcover texts and periodicals. As computer technology became increasingly commonplace during the 1990’s, the facility was minimally updated and renamed the Media Center. One of the objectives of the school’s 2012 Strategic Plan was to adapt and implement 21st century learning methodologies throughout the curriculum. In recognition of this initiative, and as a result of the dramatic impact of modern information technology tools on academics, the school made it a priority to redesign the facility. Funds raised from the highly successful 2013 Irish Nite Auction, combined with specific donations from a few generous donors, made the renovation of what is now referred to as the Academic Resource Center, a reality. Elements of this exciting renovation include: A new configuration that offers flexible space for a computer center, meeting area and lounge for small group learning A Netfloor system installed over the existing concrete allowing for fully accessible cable and power trenches for all future configurations and needs Projectors and flat screens for professional presentations for individuals, small groups and classes A centralized resource desk for tutors, ACT prep and the Writing Center Private study carrels Dedicated office space for the ARC Director and faculty New carpet and paint The ARC will open its doors to Brother Rice students in January 2014. Installation of Netfloor system 10