Renown Health Contractor Work Standard | Page 22

Penetration Sealing

All penetrations must be sealed using approved materials rated for the application = S . T . I . Fire Caulk

Must be completed in a manner consistent with U . L . requirements

Must not exceed 30 % fill on most EMT penetrations - this is generally the maximum !

No fire caulking , putty or other sealant may be removed . All new low voltage penetrations will utilize the E-Z Path