Renown Health Contractor Work Standard | Page 12

Removal of Trash and Debris

Trash and Debris must be removed from construction sites on a daily basis

Care must always be taken to ensure that no dust is entrained into other areas while removing trash !

An enclosed cart must be used to move trash and debris through corridors or public areas - wheels need to be cleaned to prevent the spread of dust

Open containers covered with plastic or cloth are not acceptable

Construction debris may have be wet down prior to removal from the construction site . If this is done the contractor must ensure that water does not leak from containers , and will correct all leaks or spills that occur