Disruption Control -minimize impact - any work that will disrupt systems or create significant impact ( noise etc ) must first be scheduled to the maximum extent possible at least 72 hours in advance via a 72 Hour Work Request
Tool Control- must be kept in sight or locked at all times Tool Use- contractors may not use Renown tools / equipment
Site Signage -access must be controlled , permits posted , hazards noted , PPE required – provided
Utilities – typically provided – restrooms , cafeteria conditions / Sani huts / restricted operating areas of the facility