Renewable Energy & Sustainability Heroes by GineersNow Engineering GineersNow Engineering Magazine Issue No. 017, Ren | Page 60

Pakistan’s PARCO To Produce Cleaner-Burning Transportation Fuels Using Honeywell Technologies Honeywell (NYSE: HON) announced that Pak-Arab Refinery Limited (PARCO) will use technologies from Honeywell UOP and Honeywell Process Solutions to upgrade its Mid-Country Refinery near Multan, Pakistan, enabling it to meet growing domestic demand for cleaner-burning fuels. isomerization option available today. It upgrades light naphtha to produce isomerate, a cleaner gasoline blend-stock that contains no benzene, aromatics or olefins. The process uses Honeywell UOP’s portfolio of proven, high-activity isomerization and benzene saturation catalysts. The project’s Honeywell solutions will include licensing, basic engineering design and other associated services for a modular Penex™ isomerization unit, which will help make cleaner-burning high-octane gasoline, and a modular Polybed™ PSA system, which will provide a reliable source of high-purity hydrogen. In addition, the project will include automation and controls from Honeywell Process Solutions. The Polybed PSA process uses proprietary Honeywell UOP adsorbents to remove impurities at high pressure from hydrogen- containing process streams, allowing hydrogen to be recovered and upgraded to more than 99.9 percent purity to meet refining needs. In addition to recovering and purifying hydrogen from steam reformers and refinery off-gases, the Polybed PSA system can be used to produce hydrogen from other sources such as ethylene off-gas, methanol off-gas and partial-oxidation synthesis gas. “These Honeywell technologies will address the increasingly urgent need for low-emission transportation fuels under the Pakistani government’s tightening environmental regulations,” said Mike Millard, vice president and general manager of Honeywell UOP’s Process Technology and Equipment business. “PARCO chose to have these technologies delivered as modular equipment rather than in-field construction for faster startup, higher quality and better unit performance.” The Penex process is the highest-performing 58 Renewable Green Leaders • May 2017 The facility also will use Honeywell’s Experion Process Knowledge System (PKS), which uses a unified automation system and advanced software applications to increase operator productivity and profitability. PARCO chose Honeywell’s technology due to its long record of experience with the company, its proven record of success in Pakistan and its modularization capability for rapid project implementation.