Editor’s Choice
Busy Times for www.ladderlifts.co.uk
RPH "The Hoist People"
Cistermiser and Keraflo’s new
corporate website
celebrates “Our World Is Water”
Cistermiser Ltd and sister
company Keraflo Ltd are jointly
presented in a brand new
corporate website
www.ourworldiswater.co.uk which
reinforces a shared commitment
to producing smart, efficient
water management solutions that
optimise control, deliver savings
and help to ensure the safety and
preservation of the earth’s most
precious resource.
With their headquarters and
manufacturing centre in Woodley,
Reading, the two companies
boast proud histories spanning
over 35 years of service to the UK
construction industry, with design
and development of proven and
innovative products.
The Keraflo brand is renowned for
top quality Aylesbury delayed-
action mechanical float valves
and Tanktronic systems for
management of cold water storage
tanks. The Cistermiser name is
synonymous with proven and
reliable products that control
all water outlets in commercial
washroom environments, as
well as Combimate limescale
prevention devices for domestic
applications.
Contact us for details/availabilities on all our ranges, from truck,
trailer mounts & demountables. Getting tough jobs done with
safe working practice at height & total efficiency.
Remember! If you’re not sure!, we can assist in surveys either on-
site by one of our specialist hoist operators or simply resolve any
queries straight away by a call or e-mail.
A very busy 2018 so far, supporting safe lifting with such a
wide range of industries, fine art, removals, air-conditioning,
construction, garden builders and so many more i could mention.
Above are just a few pictures from our latest hires.
www.ourworldiswater.co.uk
www.rphhire.com
STRUCTURAL SOLUTION HELPS CUT COSTS
FOR MAJOR REFURBISHMENT PROJECT
A comprehensive survey and design exercise
by a leading structural engineering practice
has helped reduce costs and transform a
disused mill into luxurious new residential
accommodation. Greater Manchester-based
Rhodes & Partners undertook the work on
the Grade II listed building, and devised a
solution which helped minimise the need for
costly temporary work by utilising as much
of the original structure as possible. works appeared to be needed for the
restoration. However, Rhodes & Partners
were able to design a detailed system of
cross-bracing which stabilised the building
and enabled the refurbishment to proceed
without the need for temporary works. This
also allowed as much as possible of the
original structure to be repaired rather than
replaced, and proved to be a very cost-
effective solution.
With much of the building derelict, and
one area suffering from a high degree of
deflection, a significant amount of temporary A river runs directly under the mill in a series
of channels, some of which had failed,
and the potential for flooding was a major
consideration. The Rhodes & Partners
solution allowed the channels to be reused
and ensure a flow capacity that is more
than adequate, even in flood conditions.
This allowed the river to remain undisturbed
beneath the building.
The completed development now offers a
selection of luxury apartments.