Refurbishment and Restore Issue 12 2018 | Page 80

BEDROOM 2 Ex.WL1-04 BEDROOM WC Ex.DL1-02 Ex.DL1-03 BATHROOM HALLWAY Ex.DL1-01 Ex.DL1-04 EXISTING FIRST FLOOR PLAN New.RL-01 New.RL-02 BEDROOM PLAY ROOM EAVES STORAGE LANDING New.RL-01 2- 02 PROPOSED LOFT FLOOR PLAN Colour: Each floor level has an accent colour finish to the joinery, brassware and ironmongery. These colours were chosen by the clients daughters and provide a playful contrast to the douglas fir and grey joinery. Doors: The internal full height doors are clad in douglas fir, to act as opening portions of the walls within which they sit. Hexagonal brass recessed finger pull details reference the original hexagonal tiles found in the old bathrooms. Concrete: The polished concrete floor to the ground floor level has stones set in it collected by the owner’s daughters from their travels. The concrete sinks in each bathroom are made using a black aggregate to contrasts with the colourful brassware. Garden Door: The garden door sits at 4 metres tall, taking advantage of the full height brickwork wall that the extension encloses onto. 80 - www.refurbandrestore.co.uk BATHROOM DL BEDROOM New.RL-03 READING NOOK