HOW DO YOU USE TX 140 ® 2-in-1?
FILLING
For glued coatings,
firstly treat the joints.
STEP 1:
FILL THE JOINTS
• Fill the joints using
a smoothing blade or trowel,
applying the skimcoat vertically
and then horizontally.
• Leave to dry for 12 to 24 hours.
• Sand to remove any excessive
thickness.
FULL APPLICATION
STEP 2:
FIRST FULL COAT
• Apply skimcoat to the entire
wall.
• Leave to dry for 12 to 24 hours.
STEP 3:
SECOND COAT
• If necessary, apply a second,
thinner coat of filler.
• Sand lightly beforehand.
• Leave to dry for 24 to 48 hours
before painting.
BEFORE/AFTER
TILES
32 - www.refurbandrestore.co.uk
CORK
PAINTING
STEP 4:
PAINTING
• TX 140 ® 2-in-1 may be
overcoated by all types of indoor
and outdoor paint (except mineral
paint).
• Sand lightly beforehand.