must be in a “healthy” building, in a
sound mind and healthy body. Opening
this building only a few days ago, it
seems that students and teachers
appreciate the peacefulness, the
brightness and light that prevails.
We hope that everyone finds learning
to be a cheerful experience and that
students keep happy memories of their
time in high school.
Product Description.This project has
a double-structure : the basement of
the ground floor is realized in poured-
in-place concrete while the two upper
44 - www.refurbandrestore.co.uk
floors are made of lamibois structure
(pole and floor) and a lamibois frame.
This choice of structure correspond
with a construction strategy. The
wooden structure allows a much faster
realization than the masonry.
On the facade, the wood is left
untreated in order to hold a silver
patina for the Douglas wood poles, the
Douglas wood claddings, the Larch
wood exterior joineries (Larch) and
the Oregon pine rolling shutters. The
construction work have been carried
out by local companies (10 to 20
workers).