RACA Journal I May 2026 www. refrigerationandaircon. co. za 35
A project of this complexity required co-ordination across multiple contractors and continents:
• EP Refrigeration designed and built the ammonia plant and piping networks.
• ITD handled ducting and AHU installations.
• German AHU supplier, Robatherm, provided pharmaceutical-grade units.
• EMAIR supplied textile ducting.
• Lactalis Engineering( France) oversaw design management and compliance verification. project
Monthly site visits by Lactalis’ French project manager ensured alignment with global standards, while local contractors managed day-to-day progress.
Despite the number of stakeholders, Magnus described the teamwork as smooth:“ Even though all the contractors were direct appointments managed by the client, it went well. It was a good team.”
The R59-million upgrade at Lactalis Clayville Nutritionals represents more than a technical project – it is an investment in consumer trust, regulatory compliance and global competitiveness.
By prioritising air quality and zoning, supported by a forwardthinking refrigeration backbone, EPR and its partners have created a facility that not only meets today’ s standards but is also ready for tomorrow’ s growth.
In the words of Magnus, the achievements worth bragging about are a world-class air handling system, built on innovative engineering, international collaboration and an unrelenting focus on infant nutrition safety. RACA
A vertical stainless-steel tank for the storage of required chilled water.
Project name: |
|
Zoning project |
List of professionals: |
|
Name of company |
Owner |
|
Lactalis |
Project manager |
|
Lactalis France Engineering department |
Consulting engineer |
Mechanical |
Energy Partners Engineering |
Contractors |
HVAC & R |
Energy Partners Refrigeration, ITD as HVAC sub contractor |
Product suppliers |
Product |
Supplier |
|
Compressors |
GEA |
|
Condensers |
HC |
|
Pumps |
KSB |
|
AHUs |
Robatherm |
|
Textile ducting |
EMAIR |
|
PHE |
Alfa Laval |
Commissioning under real production conditions presented additional challenges.