Feature iv . Testing and commissioning :
• Thorough testing : Conduct rigorous testing of the assembled AHU to ensure compliance with design specifications . This includes assessing airflow rate , temperature and humidity control , and overall unit performance .
• Commissioning : Start up the AHU and adjust controls to ensure it operates according to the design brief provided by the consultant .
Following these sequential steps , engineers can design and construct a custom AHU tailored to the application ' s requirements , ensuring optimal performance and efficiency .
5 . The relationship between AHUs and VRFs AHUs connected to variable refrigerant flow ( VRF ) systems enable the execution of cooling , heating and dehumidification with the latest energy efficiency offered by the variable refrigerant flow condensing unit . These systems are generally more energy-efficient than conventional AHUs traditionally connected to two-pipe or four-pipe chillers . This heightened efficiency is attributed to their ability to adjust refrigerant flow according to demand and operate at higher suction temperatures .
6 . What are the common problems associated with AHUs ? AHUs embody intricate systems comprising various components , which may encounter a spectrum of challenges by their nature . Here , we highlight some prevalent issues associated with AHUs , acknowledging that this list can be expansive depending on the specific components included in the AHU :
I . Airflow and pressure challenges a . Clogged air filters b . Malfunctioning dampers
II . Component failures
a . |
EC fan failure |
b . |
Coil blockages |
c . |
Sensor malfunctions |
d . |
Control valve failures |
III . |
Control and performance issues |
a . |
Improper settings |
b . |
Water leaks |
c . |
Increased noise levels |
d . |
Maintenance neglect |
7 . |
How can you maintain your AHU to ensure optimal |
performance ? |
Ensuring your AHU maintains peak performance is crucial |
for sustaining optimal efficiency , improving air quality , and |
Large Glycol AHU .
minimising energy costs . Here are essential steps you can take to achieve this :
Prioritise cleanliness : 1 . Filters :
• Regularly inspect and replace air filters according to the manufacturer ' s recommended schedule . Clogged filters impede airflow , reducing efficiency and compromising air quality .
2 . Coils :
• Clean both heating and cooling coils as needed . Dust and debris accumulation hinders heat transfer and efficiency . Utilise professional cleaning methods or refer to your AHU manual for specific instructions .
3 . Drain pans and drain piping :
• Ensure proper drainage to prevent leaks and mold growth . Routinely clean drain pans and piping , removing debris and checking for clogs .
Mechanical maintenance : 1 . EC plug fans :
• Periodically clean fan blades to eliminate accumulated dust and debris , enhancing airflow and preventing imbalance issues .
2 . External components :
• Wipe down the exterior of the fan , including the housing and accessible parts , to maintain a clean and efficient operation .
3 . Dampers :
• Confirm smooth damper operation without obstructions – lubricate damper linkages when necessary .
4 . Electrical connections :
• Regularly check for loose connections , frayed wires or potential electrical hazards .