RACA Journal January 2019 | Page 73

Professionals who care MICHAEL YOUNG Michael Young iis a trainer, coach and contracts engineer in the HVAC industry. He graduated from the University of the Witwatersrand in the field of Mechanical Engineering (B.Sc Mech Eng) in 2008 and qualified as a Professional Engineer (Pr.Eng) in 2013. Michael is passionate about promoting knowledge and helping other young engineers grow within the industry through his training workshops and coaching sessions. PERFORMANCE, FLEXIBILITY, RELIABILITY By Michael Young Your success within the data centre industry is often determined by these three factors. A ll our articles have spoken about performance and costs. So, where does flexibility and reliability come into the picture? Can it really influence the final design of our cooling system? A few months ago, I was invited to attend a conference call with a new client regarding one of my proposals for a new cooling system for a data centre. When I initially attended the call, I thought that performance and costs were the topics that were going to be discussed. To my surprise, both these topics were never mentioned. Instead, I was asked, “How do we operate the cooling units when 10% of the servers are populated?” The next question that followed was, “How do the cooling units respond when there is a loss of power within the data centre?” At this point, I learnt that there is more to a cooling solution than just performance and capital costs. Flexibility to adapt to the needs of business, and reliability were additional needs of the client. Flexibility is the new scope of work that everyone needs to consider. The drive for such flexibility in the cooling solution is to reduce the total cost of ownership for the final client. So, why is flexibility to the business so important when it comes to cooling? In one of my previous projects, we installed five cooling units in a new data centre. Each cooling unit could provide 100kW of sensible cooling. After five months, we discovered that the cooling system consumed a large amount of energy and the units www.hvacronline.co.za failed on many different errors (cycling of compressors being one of those errors). After conducting a site audit, it was discovered that the servers were not fully populated and the data centre only required 100kW of cooling. So, operating five cooling units (even at a modulated capacity) wasted energy and resulted in the failure of the cooling units on certain alarms. To overcome this problem, we integrated teamwork operations, which now modulated units where part loads existed, or ramped up units where full cooling was required. Clients are now addressing the issue of partial rack population, as they have realised that data centres are never fully populated on the first day of operations. The new trend within the industry is to split the cooling integration into phases. Phase 1, termed ‘Day 1’, will often cater for a specific initial start-up load, while Phase 2, termed ‘Day 2‘, will cater for the full or maximum load of the data centre. In some instances, the type of technology was changed as the project progressed. The client requested us to use a DX system for Day 1 and a chilled water system for Day 2. As you can imagine, the management of the project was complex, as the installation and cutover to the chilled water system had to be done on a live data centre. Flexibility is the new scope of work that everyone needs to consider. The drive for such flexibility in the cooling solution is to reduce the total cost of ownership for the final client. If you would like to learn more on how flexibility influences the design of a cooling system, log onto www.myhvaccoach.com and watch our video series on data centre design. Wishing you a successful month ahead. RACA RACA Journal I January 2019 71