RACA Journal January 2019 | Page 55

Projects • • • • • • • Old light fittings were replaced with LED lamps. DBs and control panels were replaced to ensure adherence to current standards and to improve layout and ensure general conformance and maintainability. The old CO 2 gas suppression system in Block C (protecting the main genset plant room and the diesel day tank room) was replaced with an environmentally friendly and safe Novec system from 3M (Sevo Systems), with all components complying with SANS, UL, and ISO standards. General fire detection and protection were improved. More breathing sets and suits were provided, fire escapes were added, and the fire detection system was upgraded to accommodate the new plant-room layout. A walkway was installed on the roof of Block A to make access to scientific instruments easier and safer. Wind tunnel tests were conducted to ensure that the walkway would not have negative effects such as dumping of snow on the leeward side. A new safety net was installed at the cliff edge. The entire building and systems were modelled in Revit. 1 2 Continued on page 55 1. 2. 3. Drawing of the layout of the new hangar installation. 3D schematic of the hangar layout. One of the new fan coil units installed. 3 www.hvacronline.co.za RACA Journal I January 2019 53