MODELLING WSP modelled the MEPF systems in Revit , which is a modern building information modelling software for architects and engineers , designers and contractors and developed by Autodesk .
Revit allows designing and coordinating the MEPF system components in 3D , annotates the model with 2D drafting elements , and accesses building information from the building model ’ s database .
ABOUT THE AUTHOR Pieter de Bod ( Pr . Eng .) is an accredited LEED BD + C and Green Star Professional and is currently working at WSP in Dallas , Texas , US . RACA
Construction commenced in mid-2019 and final completion was achieved towards end 2020 .
The new Medical Office Building in Mansfield , Texas .
Construction of the HVAC system . Observe the VAV boxes sealed off to prevent dust from entering the system .
CHALLENGES Some of the major challenges on this project included the space constraints with limited ceiling where the contractor had to fit VAV boxes and ducting . However , all challenges were easily overcome through the regular multi-disciplinary coordination sessions that stimulated open communication between all the professionals involved .
Another challenge , especially for the contractor , was to test and balance and commission the HVAC system to ensure that design parameters were achieved .
LIST OF PROFESSIONALS AND SUPPLIERS |
Architect and Prime Consultant |
The Beck Group |
Consulting MEPF Engineers |
WSP USA |
General Contractor |
The Beck Group |
Mechanical Contractor |
Don Burden and Associates Inc . |
Rooftop Units |
Daikin |
4 |
DX Units |
LG |
7 |
VAV Terminals |
Enviro-Tec ; Vendor is Texas Air Systems Inc |
72 |
Fans |
Loren Cook ; Vendor is Texas Air Systems Inc |
9 |
Diffusers , Grilles |
Naylor Industries |
Various |