RACA Journal Directory 2020 | Page 177

2019 PROJECTS 2019 Projects RACA Journal JANUARY MARCH CUSTOM- DESIGNED COOL HVAC SYSTEM FOR CUMMINS SANAE IV ANTARTICA REFURBISHMENT The efficient building design for the new Cummins head office in Midrand includes several innovative and energy- saving technologies to conform to the company’s global image. South Africa’s SANAE IV base in Antarctica was ready for a refurbish in the base and equipment after running 24/7 for 18 years. To counter location and weather conditions notable design features, energy saving measures, and the latest sustainable technology systems were installed. FEBRUARY TAILOR-MADE FABRIC DUCTING SOLUTION FOR CHAMDOR TRANSNET INYANDA: RETROFITTED COMFORT AND EFFICIENCY When the Chamdor Faktry Sales fabric warehouse in North Riding expanded, it was time to upgrade its HVAC system as well. A full fresh air evaporative cooling system with textile ducting was installed, serving the now combined area of 5 991m 2 . The Johannesburg head office of Transnet Freight Rail required a cost-saving approach in increasing the comfort levels inside the 12m atrium with a glass façade and open areas. An underfloor HVAC system helped reduce energy by a whopping 50%. www.hvacronline.co.za | www.coldlinkafrica.co.za HEVAC&R Directory 2020 173