• Throughout the project , the hotel was open for business as usual , requiring our teams to work and ensure that they were out of site , did not disturb the hotel users and ensure that at all times even though we were stripping up the roof , it had to be watertight and no further leaks could occur .
• The volume of plant that was present on the roof , including chillers , AC units and large amounts of pipework meant that the working space and clearance from the deck was limited and a bespoke approach was needed , ensuring that all areas of the roof could safely be stripped and replaced in line with the specification and manufacturer ’ s requirements .
• Pigeons , or more accurately the deposits that they leave ! In order to be able to work in specific parts of the roof and also maintain the safety of our operatives , before any work could be carried out the team had to safely neutralise and remove the presence of pigeon guano .
T : 03335 671512 | www . buildingtransformation . com | info @ buildingtransformation . co . uk