Project challenges
Due to the hotel ’ s central London location , including the extreme volumes of vehicular and pedestrian traffic , we encountered various challenges throughout the project , including :
• Unique and difficult access to each section of the façade , including a lack of fixed abseil anchor points .
• Roof level phone masts affecting the safe delivery of the work . Each mast must be turned off to allow operatives to work around it , which required advanced negotiations with the phone companies and daily safety checks .
• Delivery of works at high-level , with exposure to higher wind speeds .
• An active hotel open for business , with delivery of works during restricted timescales .
• Pedestrian access across the front and side elevations , requiring exclusion zones , a banksperson and council permits .