PSL on the Pulse (12/5/25) Vol. 9 Issue 12 | Page 9

Improvements to the corridor will accommodate future traffic volumes and uphold the integrity of the neighborhood. This project aims to enhance safety, improve pedestrian and bicycle movements, reduce congestion and facilitate more efficient traffic flow. Key enhancements in Floresta Drive Phase 3 include:
• New roundabouts
• Dedicated bicycle lanes
• Sidewalks
• Intersection improvements at Prima Vista and Floresta
• Stormwater treatment pond site
• Integration with the Crosstown Parkway intersection
• Installation of baffle boxes
• Improvements to the D-11 Canal
Motorists are advised to exercise caution and reduce speed while traveling through the work zone. The speed limit has been lowered to 25 mph in this area to ensure the safety of residents, motorists and workers.
Roadway Resurfacing www. cityofpsl. com / repaving The Sales Tax resurfacing goal for FY 2025-26 is 23.55 miles with 3.80 miles completed to date. Residents are notified in advance of resurfacing.
Sandpiper Bay( Mid): Complete Northport Village( Mid): Complete Southbend Lakes: Scheduled Palm Trails: Pending schedule Rosser Reserve( East): Pending schedule Tulip Park and Crane Landing: Pending schedule
PSL
ON THE
PULSE www. CityofPSL. com / SalesTax
9